The House God Built is moving forward. Plumbing rough-in is finished and electrical rough-in should be finished by the end of this week. After inspections and HVAC rough-in we'll be ready for drywall to be installed. Watch for information about when this will be starting as we'll need plenty of volunteers at that stage of construction.
Outside THGB we worked on digging forms for the front porch. Once those are inspected we'll be able to build the porch. As weather permits we'll begin siding the house also. Last week we got the fantastic news that the siding had been donated! We'll soon need people to hang it. Check back here regularly for news about when that will go up.
Many thanks go out to all who have donated materials or labor to this project! If you would like to sign-up to help check out http://www.thehousegodbuilt.volunteerhub.com/ or give us a call at 573-837-4047.