Today the insulation is being blown in at THGB. Once it has dried we will be able to start installing the drywall on the perimeter walls. This weekend we would also like to move rock into the new portion of the basement in preparation for pouring the floor. If you would like to help, please sign-up or give us a call at 837-4047.