Wednesday saw many things crossed off the to do list at The House God Built. Outside the remainder of the concrete was poured for the driveway and sidewalks. Inside we started assembling the stair railings, finished painting most of the interior doors, touched up trim, put a first coat of paint on the inside of the exterior doors, and sealed the grout in the upstairs bathroom.
Our plans to lay brick on the driveway tonight have been postponed. We will continue to finish up tasks inside THGB to be able to turn rooms over to the decorating team as soon as possible. Tonight we will continue with paint touch-ups and hopefully be able to install the last of the interior doors and trim. We also will continue with the stair railing installation. If you are able to help please come on over. We'll start working at about 6 pm.