Monday night we hauled several loads of dirt out of the backyard and have it nearly at the final grade. This weekend we'll complete the grading after installing the gutter drains. We also loaded the brush, limbs, and stumps from the trees that were taken down in the process of installing the sewer line.
The wood flooring arrived and was quickly brought into THGB by a large group of volunteers after the materials and tools were removed from the first and second floors. We also installed cement board and tile in front of the fireplace and finished laying the remaining tile on the first floor.

On Tuesday the first level gets wood flooring during the day and the tile gets grout that evening. We also may have an opportunity to do siding and some carpentry work on the steps during the day.

It's an exciting time to see the progress at The House God Built. Come be a part of it! We will definitely be working at 6 pm and may add a daytime work session as well. The blog will be updated if a daytime work session happens.

No comments: