This weekend we have many things planned and would love to finish all of them and more if possible. With the extra day on Monday we are optimistic that these are all possible to complete with your help.
- Install toilets and tub fixtures. Countertops have been delayed until Tuesday so sinks will have to wait until next week.
- Cut up some brush that remains on the back of the property near the alley and haul it off next week.
- Ventilate the attic over the porch into the second floor attic.
- Install remaining doors and trim on first floor.
- Set stones on fireplace.
- Level driveway.
- Finish framing driveway.
- Start sculpting the soil to it's final condition prior to seeding.
- Finish back retaining wall.
- Repair driveway retaining wall.
We appreciate all of the help we've had so far with this amazing project and with a little more help we can see this through to completion soon. Besides physically helping with construction we can still use your prayers and donations. If you would like to help out please give us a call at 837-4047 or stop in to see us this weekend.
We'll be working on Saturday from 8 am until we're too tired to continue any longer. Lunch will be provided at noon. On Sunday we'll start working at about 1 pm and again work until we can't go any longer. We'll decide Monday's schedule based on how much we get accomplished on Saturday and Sunday. Hope to see you this weekend!