Given the outstanding weather this weekend we concentrated our efforts on the outside of The House God Built on Saturday by grading and framing the sidewalks and placing gutter drains. Inside we painted and installed cement board on the fireplace in preparation for masonry work.
Today we'll continue working outside on framing the remainder of the sidewalks and driveway. We also need to form and pour the curbs and a pad for the air conditioning units today. We'll also install the last bit of the gutter drains and back fill trenches. Our hope is to pour the driveway, sidewalks and new basement floor this week.
We would love to have your help with these plans. Stop by today or check back on the blog for updated information on when we'll be working this week at The House God Built.